Floor plan canvas

Technician routing + HPC floor state

Visualize hot/cold aisles, inventory caches, and technician loops across all three levels. Pick any bundled set of dispatch tickets to generate a dependency-aware walk order that respects inventory pulls, elevator penalties, and Ops desk hand-off.

Technician bundles

Select a bundle to generate a walk order.

2 groups
Level 1 · Ops stagingConcourse (0 ft) · 9×10 cells

Legend

#0 · Technician desk

Start and end point for every field round trip.

#1 · GPU pod · in use

Fully utilized racks pushing thermal envelope.

#2 · Mixed workload

Shared CPU/GPU sleds; allocation is fluid.

#3 · Idle / standby

Capacity available for burst or maintenance.

#4 · Hot aisle

High thermal zone between opposing racks.

#5 · Cold aisle

Conditioned intake path for chilled air.

#6 · Inventory cache

Spare parts staging, optics, or gaskets.

#7 · Elevator / lift

Vertical lift to move carts between floors.

#8 · Restricted

Maintenance only / blocked aisle.

#9 · Access corridor

Neutral walkway or staging lane.

#10 · Sensor cluster

Environmental or vibration telemetry island.

Technician loop

Bundle 2 · PROVISIONING · DEPLOYMENT

68% similarity · 7 tasks

14 stops

Floors

L1 → L2 → L3

Critical

0

Distance

~269 m

L1

Ops desk

Turn 0 · Briefing + cart checkout

standard

L1

QSFP cache

Turn 1 · Pull qsfp, fiber-kit

standard

L1

Gasket & coolant bin

Turn 2 · Pull cooling-kit, sensor, psu

standard

L1

Tool crib

Turn 3 · Pull install-kit, diagnostic-pack

standard

L1

Calibrate lidar mapping bot

Turn 4 · Mapping bot drifting 3cm on loops; needs calibration prior to safety checks.

standard

L1

Lift A (L1→L2)

Turn 5 · Ride up to L2

standard

L2

Inspect liquid loop Delta pod

Turn 6 · Liquid loop Delta pod trending warm, inspect manifolds and bleed air.

high

L2

Install GPU sled bumpers

Turn 7 · Fit bumpers to prevent sled vibration on pod J.

standard

L2

Verify cabling bundle 44B

Turn 8 · Bundle 44B mislabeled after overnight work; verify and document cable map.

standard

L2

Lift A (L2→L3)

Turn 9 · Ride up to L3

standard

L3

Install smart PDU for rack N09

Turn 10 · Upgrade legacy PDU to smart metered unit prior to new tenant arrival.

standard

L3

Lift A (L3→L2)

Turn 11 · Ride down to L2

standard

L2

Lift A (L2→L1)

Turn 12 · Ride down to L1

standard

L1

Ops desk

Turn 13 · Close loop + update dispatcher

standard

Level 1 · Ops staging · telemetry

Temp

21°C

Airflow

Intake plenum

Humidity

42%

Inventory spots

QSFP cache

46x 400G optics

cell (7, 1)

Gasket bin

Cold plate kit

cell (8, 1)