Floor plan canvas
Visualize hot/cold aisles, inventory caches, and technician loops across all three levels. Pick any bundled set of dispatch tickets to generate a dependency-aware walk order that respects inventory pulls, elevator penalties, and Ops desk hand-off.
Technician bundles
Select a bundle to generate a walk order.
Legend
#0 · Technician desk
Start and end point for every field round trip.
#1 · GPU pod · in use
Fully utilized racks pushing thermal envelope.
#2 · Mixed workload
Shared CPU/GPU sleds; allocation is fluid.
#3 · Idle / standby
Capacity available for burst or maintenance.
#4 · Hot aisle
High thermal zone between opposing racks.
#5 · Cold aisle
Conditioned intake path for chilled air.
#6 · Inventory cache
Spare parts staging, optics, or gaskets.
#7 · Elevator / lift
Vertical lift to move carts between floors.
#8 · Restricted
Maintenance only / blocked aisle.
#9 · Access corridor
Neutral walkway or staging lane.
#10 · Sensor cluster
Environmental or vibration telemetry island.
Technician loop
Bundle 2 · PROVISIONING · DEPLOYMENT
68% similarity · 7 tasks
Floors
L1 → L2 → L3
Critical
0
Distance
~269 m
L1
Ops desk
Turn 0 · Briefing + cart checkout
L1
QSFP cache
Turn 1 · Pull qsfp, fiber-kit
L1
Gasket & coolant bin
Turn 2 · Pull cooling-kit, sensor, psu
L1
Tool crib
Turn 3 · Pull install-kit, diagnostic-pack
L1
Calibrate lidar mapping bot
Turn 4 · Mapping bot drifting 3cm on loops; needs calibration prior to safety checks.
L1
Lift A (L1→L2)
Turn 5 · Ride up to L2
L2
Inspect liquid loop Delta pod
Turn 6 · Liquid loop Delta pod trending warm, inspect manifolds and bleed air.
L2
Install GPU sled bumpers
Turn 7 · Fit bumpers to prevent sled vibration on pod J.
L2
Verify cabling bundle 44B
Turn 8 · Bundle 44B mislabeled after overnight work; verify and document cable map.
L2
Lift A (L2→L3)
Turn 9 · Ride up to L3
L3
Install smart PDU for rack N09
Turn 10 · Upgrade legacy PDU to smart metered unit prior to new tenant arrival.
L3
Lift A (L3→L2)
Turn 11 · Ride down to L2
L2
Lift A (L2→L1)
Turn 12 · Ride down to L1
L1
Ops desk
Turn 13 · Close loop + update dispatcher
Level 1 · Ops staging · telemetry
Temp
21°C
Airflow
Intake plenum
Humidity
42%
Inventory spots
QSFP cache
46x 400G optics
cell (7, 1)
Gasket bin
Cold plate kit
cell (8, 1)